From August to September of 2022, PPL successfully implemented projects on transportation, customs clearance, Flatrack container unstuffing, etc. PPL keeps cooperating with the existing partners and works with new clients particularly Formosa Ha Tinh Steel Corporation, Tatsumi Vietnam, SCI Group, and CMEC Comtrans.
Formosa project
PPL has done the Formosa project with Formosa Ha Tinh Steel Corporation. PPL transported an OOG package of Coke batch heat exchangers.
The package had dimensions of 11.8m x 4m x 4.4m and a weight of 95 tons. The shipping route of the package was from Hai Phong port to Formosa Ha Tinh factory.
Bac Ninh garbage power plant project
PPL to carry out the project of unstuffing 4 Flatrack containers and transporting goods to Bac Ninh Garbage Power Plant.
The shipment which was more than 91 tons and 400 m3 was transported from Hai Phong port to Bac Ninh Garbage Power Plant (Cuu Yen village, Ngu Thai commune, Thuan Thanh district, Bac Ninh province, Vietnam).
Dak Lak Wind Power Project
Dak Lak Wind Power Project with wind power plants: Cu Ne 1-2 Wind Power Plant and Krong Buk 1-2 Wind Power Plant. PPL to undertake the transportation and customs clearance for the parcel.
The project included 73 wind power turbines (heaviest item code: 86.9 tons, longest product code: 77m). Transport route from Phu My port to the construction site with a distance of 455 km and from Cam Ranh port/ South Van Phong Port to the construction site with a distance of 292 km.
By the end of September 2022, PPL has finished transporting 54 turbines for this project.
Nam Sam 3 Project
PPL undertook customs clearance and transport of bulk cargo from Vietnam to Laos. The total weight of the package was 23 tons, transported from Hanoi and Bac Ninh to the construction site of Nam Sam 3 Hydropower Plant, Houphanh province, Laos.
Follow us on social media: