XLP member, Origin Logistics in Istanbul, Turkey successfully loads Metso Shredder as well as its components from Izmit, Turkey to Wellington, United Kingdom. The total weight of the cargo was 3,430kgs with a total of 87 component pieces, which were loaded on flat racks and open top containers. It was a door to port project from Kazan, Ankara via İzmit port to Wellington, UK.

The equipment used were 3x40’ flat racks & 6x40’open top containers. Origin Logistics’ projects team controlled every step of the project including surveying the whole process and was involved in the necessary points during the loading process at the factory. All lashing, securing activities and port operations were well observed and tracked by thier operation department and field stuff.