Agence Maritime Mohab, member of the Worldwide Project Consortium (WWPC) for Tunisia, reported about an urgent delivery of a Skid Piping box, from arrival on a flat rack at Tunis Port to the destination site.
The experts from Mohab arranged for the handling and mobile crane assistance to unload the Skid Piping box of 2,7 ton and dimensions 175 x 272 x 336 cm and safely delivery to the destination site using a low body trailer.
Follow us on social media: