Turk Heavy Transport Handle 11 Transformers for Hyundai Heavy Industries
Dec 06, 2016
Bahraini PCN members, Turk Heavy Transport have been involved in an ongoing project for Hyundai Heavy Industries over several months. The project, which was recently completed, consisted of 8 x 30mtn and 3 x 150mtn transformers for the Electricity and Water Authority. Turk Heavy Transport provided complete port-to-door logistics solutions for the project including road permissions, escort arrangements and road-works along the route to make the passage of trucks possible. The unloading operations were performed using a jack-and-skidding system.
As a result of the expertise and efforts from Turk Heavy Transport, the shipments were delivered safely and on-time with their client very happy with their services.
Whats this about?
It is the “uncontained” shipments that draw a lifetime allegiance of purveyors of the business. As one MPV (Multi Purpose Vessel) analyst bluntly said as an aside, “Boxes are boring.”
Follow us on social media: