Rosharon, Texas - Mammoet has been contracted for a liquefied natural gas (LNG) project in Freeport. The scope of the project includes transporting a substantial number of pieces to two different sites located three miles apart. Mammoet has optimized the transport process by using two different methods of transport, by barge and over the road, depending on the various weights and sizes of the pieces, resulting in significant time savings. To accomplish this project, Mammoet will utilize barges at three different docks, self-propelled modular transporters (SPMTs) and trailers with a range of axle lines. Transport of the first pieces began in April 2016 and continue through 2017. “With the project taking place at two different locations and multiple teams responsible for coordination, communication will be the key to success,” - Pierre Mille, Mammoet USA Sales Director