Kaleido Logistics S.L., member to the Worldwide Project Consortium (WWPC) for Spain, proudly reported to have managed the first wind farm project ever in Indonesia.
On behalf of their client Kaleido arranged for the oceantransport for the windfarm components from China to Indonesia and managed the onward transportation to the remote and beautiful South Sulawesi Region. The scope of this challenging project work for Kaleido included the sea transport from China to Indonesia, LCT barges, floating cranes, inland transport, stevedoring, engineering, tool design for invert transport of blades by truck, design and optimization of the storage yard, lifting plans, reverse logistics, site monitoring and many more additional services.
Follow us on social media: