
The transport of the beams wasn’t smooth as part of it was partially off road delivering concrete beams weighting 130 Tons & 44 meters long Beams delivered in the most hectic area in Cairo upon which traffic had to be stopped for more than 3 hours to enable the maneuvering of the truck overcame distance, obstacles and tight schedules, solving the challenges in the fastest, safest and most cost-effective way Through careful planning, precise maneuvering.


Follow us on social media: