On the May 28, 2020, Egyptian Global Logistics (EGL), subsidiary of KADMAR GROUP completed transportation of two heavy lift vessels. The site was located about 900 km from the port (our engineers suggested using the longest road to avoid old bridges on the costal road and to save time for civil work as the client insisted on the delivery of vessels before the 28th May) It was a quite challenging operation scheme that was performed and completed, despite the difficult conditions.

Receiving the cargo at the container terminal that unloaded the cargo with terminal gantry cranes.
Current circumstances: COVID-19.
Mandatory daily curfew: from 17:00 till 06:00. (Transportations was effected during El-Fitr feast)
Vessel dimensions: 9.6 m x 5.5 m x 5.4 m. Weight: 117 tons/each.
Thanks to EGL Project Team for cooperation. EGL continues to impress the market with the well trained staff along with the latest fleet equipment and technology in Egypt.
EGL achieved this success through careful planning without sacrificing safety aspect in order to meet clients demand.