Egyptian Global Logistics (EGL) Subsidiary of KADMAR GROUP successfully delivered 2 Boilers for El Nasr Co. for Intermediate Chemicals (NCIC). The Project involved the transport of two boilers from Alexandria to Ain- El Sokhna with each 6 meters height. The prime challenge was the road elevations and the height of the boilers, as the basic route involves a number of lower bridges and obstacles. Now, with the basic route off the table for the height reason, EGL had to go through an alternative route involving narrow roads and residential areas but succeeded to safely deliver the boilers to the installation site. After a 320-kilometer journey, EGL overcame distance, obstacles and tight schedules, solving the challenges in the fastest, safest and most cost-effective way.