Combi Lift’s project Carrier MV “ Palau “  (CL 900 Type) loaded a 95m long propylene stripper weighing 540 t in Masan, Korea for Johor, Malaysia. The propylene stripper is destined for the Titan TE3 Project - Naphtha Cracking Center Expansion Project. Combi Lift Gmbh is a member to the Cargo Equipment Experts CEE network in Germany.